Steve & Elizabeth's House Addition

"Before"

Our house, before the addition

Our House Addition Project

We have a new addition off the back of our house, with a new dining room, family room, screened porch, and deck. And tying in to a new kitchen as well. Begun in 2003. Completed in 2004

Great work by our Architect, Rebecca Bostick, and our contractor/builder, Hayes Construction. Both were a pleasure to work with.

The most recent photos are at the top of the page. All photos are clickable to see enlargements

Lots of other house rennovations and additions can be found on houseblogs.net, a very nice site!

Sunday, January 25, 2004

 

No new exterior photos, but lots from the interior!

Saturday, September 6, 2003

 

Gutters are in. Grading done to improve the drainage.

September 6, 2003

Other views: interior, and screened porch.

Saturday, July 26, 2003

 

More progress on the screened porch. Deck railings replaced with the same ipe wood as the deck surface.

July 26, 2003

Thursday, July 24, 2003

 

No new images for this series, but I have posted some interior and exterior photos.

Friday, June 6, 2003

 

Siding is up.

June 6, 2003

Other views: interior and exterior.

Friday, May 30 (evening), 2003

 

Drywall installation almost complete. See interior images.

Thursday, May 22 (evening), 2003

 

The windows are in!

May 22, 2003

Other views: interior and exterior.

Monday, May 12, 2003

 

No photos to add, but much work has been completed inside, including framing within the basement, ventilation ductwork, and plumbing. Electrical wiring to be done this Thursday, and drywall windows probably next week.

Wednesday, April 30 (evening), 2003

 

Window and door openings are boarded up, awaiting the arrival and installation of new doors and windows. The real work is inside.

April 30, 2003

Tuesday, April 29 (evening), 2003

 

No substantial changes to the exterior, but many changes inside!

Saturday, April 26, 2004

 

Two views from inside.

Friday, April 25 (evening), 2003

 

Deck is finished, nad porch floor is complete (almost). Porch railing configuration changed from yesterday. Window openings wil be boarded up until the windows arrive and are installed.

April 25, 2003

Thursday, April 24 (evening), 2003

 

Roof is finished!

April 24, 2003

An additional view.

Wednesday, April 23 (morning), 2003

 

Much work has been accomplished, but most of it is "inside": framing work on the partial vault ceiling is complete, duct work under the floor is underway, and for the porch, tongue and groove floorboards have been stained and the frame for a barrel-vault celing is in place. Shingles for the roof arrived Monday evening, but weren't put on yesterday due to an impending rainstorm, which never materialized. Kitchen and some interior walls to be demolished starting next Monday!

Thursday, April 17, 2003

 

Lots of progress! As soon as the doors and windows are delivered and installed, the old back exterior wall will be removed, connecting the addition space to the existing house space.

April 17, 2003

Tuesday, April 15 (evening), 2003

 

Lots of progress this week on the complicated roof. (Last week was all rain.)

April 15, 2003

A different perspective.

Thursday, April 10 (evening), 2003

 

Not much progress this week due to rain, and heavy rain is predicted for tonight and tomorrow. A dumpster has appeared, in its second visit to our yard. (In its previous visit, it lived in the front yard, and therefore it doesn't show up in the photos below.)

April 10, 2003

Another view shows the future screened porch somewhat more clearly.

Monday, April 7 (evening), 2003

 

Rained all day today; no work on the addition. The weather report for this week is rather dismal. Rain prevents work! (At least at this stage in the process.)

Friday, April 4 (evening), 2003

 

The Hayes Construction carpenters not only do careful, precise work; they're fast too!

April 4, 2003

Another view, from the roof.

Thursday, April 3 (evening), 2003

 

Lots accomplished today! Footers and foundation for screened porch completed; subfloor laid on joists; and one wall in progress (lying flat now.)

April 3, 2003

Thursday, April 3 (morning), 2003

 

Floor joists are in. And the carpentry work looks really good!

April 3, 2003

Tuesday, April 1, 2003

 

More progress in getting ready to start framing, which begins soon. More lumber is staged in the driveway (just beyond the Porta-Potty), and some good-sized tire rut ponds have appeared.

April 1, 2003

Saturday, March 29, 2003

 

Lumber is delivered. And some trees have been removed. Impressive ruts in the mud from both the lumber delivery truck and the tree service's cherry picker.

March 29, 2003

Thursday, March 13, 2003

 

New foundation is in place.

March 13, 2003

Wednesday, March 12, 2003

 

Footings are poured, and the foundation begins

March 12, 2003

Wednesday, March 5, 2003

 

Bobcat takes care of the snow... And the topsoil! Old porch that was under the deck is gone.

March 5, 2003

Saturday, March 1, 2003

 

Deck has been removed, but the snow is in the way of putting in the new foundation (although it has melted considerably).

March 1, 2003